The consumption of electricity has increased in the country during the last three years and the current year. The details of all India Power Supply Position in the country in terms of Energy during the last three years and current year (up-to June, 2023) is given at Annexure-I. There is adequate generation capacity to meet the demand of the country. in order to meet the increasing demand of power, 18 numbers of coal based thermal power projects having total capacity of 25440 MW, one (1) gas based thermal power project having capacity of 370 MW and 42 numbers of hydro-electric projects (above 25 MW) having total capacity of 18033.5 MW are under construction in the country as on 30th June 2023. Further, Nuclear capacity totalling to 8000 MW is under various stages of construction. Also, 22840 MW additional coal based thermal capacity has been planned by 2030, out of which 15300 MW will be under Central Sector and 7540 MW under State Sector. Details are given at Annexure-II

As per the Electricity Act, 2003, generation is a de-licensed activity and any generating company may establish, operate and maintain a generating station without obtaining a license under this Act if it complies with the technical standards related to connectivity with the grid. The concurrence of the Central Electricity Authority (CEA) is required only in case of setting up of hydro-generating station.

Two (02) numbers of coal based Thermal Power Project in Central Sector (NTPC) having capacity of 3720 MW (two units of 660 MW each in North Karanpura TPS and three units of 800 MW each in Patratu TPS are under construction in the State of Jharkhand. Further, Koderma Thermal Power Project having capacity of 1600 MW is planned in the State of Jharkhand by DVC.

ANNEXURE-I

The details of all India Power Supply Position in the country in terms of Energy during the last three and current year 2023-24 (upto June, 2023) :

 

FY

Energy Requirement (MUs)

Energy Supplied (MUs)

% Growth Energy Requirement

% Growth Energy Supplied

 

 % Energy not Supplied

(1)

(2)

(3)

(4)

        (5)       

2020-21

1275534

1270663

0.4

2021-22

1379812

1374024

8.2

8.1

0.4

2022-23

1511847

1504264

9.6

9.5

0.5

2023-24 ( Upto June, 2023)*

408621

407762

1.0

1.8

 

 

0.2

*Provisional

********

AM/DP

 

ANNEXURE-II

 

I Under Construction Coal Based Thermal Projects

 

UTILITY NAME

Project Name

Capacity Under Construction

I. Central Sector (12580-MW)

NTPC /PVUNL

 

 

 

 

Barh STPP, St-I (3×660 MW)

1320

Telangana STPP St-I (2×800 MW)

1600

North Karanpura STPP (3×660 MW)

1320

Patratu STPP (3×800 MW)

2400

Talcher TPP, St – III (2×660 MW)

1320

SJVN

BUXAR TPP (2×660 MW)

1320

NUPPL

Ghatampur TPP (3x660MW)

1980

THDC

Khurja SCTPP (2×660 MW)

1320

II. State Sector  (12860 MW)

TANGEDCO

North Chennai TPP St-III (1×800 MW)

800

Ennore SEZ STPP (2×660 MW)

1320

Udangudi STPP, St-I (2×660 MW)

1320

UPRVUNL

Jawaharpur STPP (2×660 MW)

1320

Obra–C STPP (2×660 MW)

1320

Panki TPS Ext (1×660 MW)

660

APGENCO / APPDCL

Dr.NT TPS, St-V (1×800 MW)

800

TSGENCO

Yadadri TPS (1×800 MW)

4000

MAHAGENCO

Bhusawal TPS (1×660 MW)

660

WBPDCL

Sagardighi TPP, St-III (1×660 MW)

660

Total

  25440 MW

         

 

II Under Construction Hydro Electric Projects (above 25 MW)

 

Sl. No

Name of Scheme

Sector

District

I.C.                     ( No. X MW.)

Cap. Under   Execution (MW)

River/Basin

 

(Executing Agency)

 

 

Andhra Pradesh

 

 

 

 

 

 

1

Polavaram (APGENCO/ Irrigation Dept., A.P.)

State

East & West Godavari

12×80

960.00

Godavari/ EFR

 

2

Lower Sileru Extension (APGENCO)

State

Alluri Sitharamaraju

2×115

230.00

Sileru/ Godavari

 

3

Pinnapuram (Greenko AP01 IREP Private Limited)

Private

Kurnool

4×240 + 2×120

1200.00

Pennar Basin/EFR

 

 

Sub-total: Andhra Pradesh

 

 

 

2390.00

 

 

 

Arunachal Pradesh

 

 

 

 

 

 

4

Subansiri Lower (NHPC)

Central

Lower Subansiri

8×250

2000.00

Subansiri/ Brahmaputra

 

5

Dibang Multipurpose Project (NHPC)

Central

Lower Dibang Valley

12×240

2880.00

Dibang / Brahmaputra

 

 

Sub-total: Arunachal Pradesh

 

4880.00

 

 

 

 

Assam

 

 

 

 

 

 

6

Lower Kopli (APGCL)

State

Dima Hasao & Karbi Anglong

2×55+2×2.5+1×5

120.00

Kopili/ Brahmaputra

 

 

Sub-total: Assam

 

 

 

120.00

 

 

 

Himachal Pradesh

 

 

 

 

 

 

7

Parbati St. II (NHPC)

Central

Kullu

4×200

800.00

Parbati/Beas/Indus

 

8

Luhri-I (SJVN)

Central

Kullu/Shimla

2×80+2×25

210.00

Satluj/Indus

 

9

Dhaulasidh (SJVN)

Central

Hamirpur/ Kangra

2×33

66.00

Beas/Indus

 

10

Sunni Dam (SJVN)

Central

Shimla/Mandi

4×73+1×73+1×17

382.00

Satluj

 

11

Uhl-III (BVPCL)

State

Mandi

3×33.33

100.00

Uhl/Beas/
Indus

 

12

Shongtong Karcham (HPPCL)

State

Kinnaur

3×150

450.00

Satluj/ Indus

 

13

Chanju-III (HPPCL)

State

Chamba

3×16

48.00

Chanju Nallah

 

14

Tidong-I             (Statkraft IPL)

Private

Kinnaur

3×50

150.00

Tidong/ Satluj/Indus

 

                   

 

 

15

Kutehr                  (JSW Energy Ltd)

Private

Chamba

3×80

240.00

Ravi/ Indus

 

16

Tangnu Romai (TRPG)

Private

Shimla

2×22

44.00

Pabbar/Tons/ Yamuna/ Ganga

 

 

Sub-total: Himachal Pradesh

 

2490.00

 

 

 

 

Jammu & Kashmir

 

 

 

 

 

 

17

Pakal Dul (CVPPL)

Central

Kishtwar

4×250

1000.00

Marusadar/ Chenab /
Indus

 

18

Kiru  (CVPPL)

Central

Kishtwar

4×156

624.00

Chenab/ Indus

 

19

Ratle (RHEPPL / NHPC)

Central

Kishtwar

4×205 + 1×30

850.00

Chenab/Indus

 

20

Kwar (CVPPPL)

Central

Kishtwar

4×135

540

Chenab/ Indus

 

21

Parnai (JKSPDC)

State

Poonch

3×12.5

37.50

Jhelum/ Indus

 

22

Lower Kalnai (JKSPDC)

State

Kishtwar

2×24

48.00

Chenab/ Indus

 

 

Sub-total: Jammu & Kashmir

 

3099.50

 

 

 

 

Kerala

 

 

 

 

 

 

23

Pallivasal (KSEB)

State

Idukki

2×30

60.00

Mudirapuzha/ Periyar/ Baypore Periyar/ WFR

 

24

Thottiyar (KSEB)

State

Idukki

1×30+1×10

40.00

Thottiyar/ Periyar/
/ Baypore Periyar/ WFR

 

25

Mankulam (KSEB)

State

Idukki

2×20

40.00

Melachery

 

 

Sub-total: Kerala

 

140.00

 

 

 

 

Madhya Pradesh

 

 

 

 

 

 

26

Maheshwar (SMHPCL)

Private

Khargone & Khandwa

10×40

400.00

Narmada/CIRS

 

 

Sub-total: Madhya Pradesh

 

400.00

 

 

 

 

Maharashtra

 

 

 

 

 

 

27

Koyna Left Bank (WRD,MAH)

State

Satara

2×40

80.00

Koyna/ Krishna/EFR

 

 

Sub-total: Maharashtra

 

80.00

 

 

 

 

Punjab

 

28

Shahpurkandi (PSPCL/ Irrigation Deptt., Pb.)

State

Pathankot

3×33+3×33+1×8

206.00

Ravi/ Indus

 

 

Sub-total: Punjab

 

 

 

206.00

 

 

 

Sikkim

 

 

 

 

 

 

29

Teesta St. VI NHPC

Central

South Sikkim

4×125

500.00

Teesta/Brahmaputra

 

30

Rangit-IV (NHPC)

Central

West Sikkim

3×40

120.00

Rangit/ Teesta/
Brahmaputra

 

31

Bhasmey (Gati Infrastructure)

Private

East Sikkim

2×25.5

51.00

Rangpo/ Teesta/
Brahmaputra

 

32

Rangit-II (Sikkim Hydro)

Private

West Sikkim

2×33

66.00

Greater Rangit/ Teesta/
Brahmaputra

 

33

Panan (Himagiri)

Private

North Sikkim

4×75

300.00

Rangyongchu/ Teesta/
Brahmaputra

 

 

Sub-total: Sikkim

 

 

 

1037.00

 

 

 

Tamil Nadu

 

 

 

 

 

 

34

Kundah Pumped Storage Phase-I,II&III)

State

Nilgiris

4×125

500.00

Kundah/ Bhavani/        Cauvery/EFR

 

 

Sub-total: Tamil Nadu

 

 

500.00

 

 

 

 

Uttarakhand

 

 

 

 

 

 

35

Vishnugad Pipalkoti (THDC)

Central

Chamoli

4×111

444.00

Alaknanada/ Ganga

 

36

Naitwar Mori (SJVNL)

Central

Uttarkashi

2×30

60.00

Tons/Yamuna/ Ganga

 

37

Tapovan Vishnugad (NTPC)

Central

Chamoli

4×130

520.00

Dhauliganga / Alaknanada & /Ganga

 

38

Tehri PSS (THDC)

Central

Tehri Garhwal

4×250

1000.00

Bhilangna/ Bhagirathi/
Ganga

 

39

Lakhwar Multipurpose Project (UJVNL)

State

Dehradun & Tehri Garhwal

3×100

300.00

Yamuna

 

40

Lata Tapovan (NTPC)

Central

Chamoli

3×57

171.00

Dhauliganga / Alaknanada & Ganga

 

41

Phata Byung (LANCO)

Private

Rudraprayag

2×38

76.00

Mandakini/ Alaknanda
Ganga

 

 

Sub-total: Uttarakhand

 

2571.00

 

 

 

 

West Bengal

 

 

 

 

 

 

42

Rammam-III (NTPC)

Central

Darjeeling

3×40

120.00

Rammam/ Rangit/Teesta Brahmaputra

 

 

Sub-total: West Bengal

 

 

 

120.00

 

 

 

Total:

 

 

 

18033.50

 

 

                   

 

III Under Construction Gas based thermal Power plant

Sl. No

PROJECT

State

Sector

UNIT

Capacity (MW)

1

Yelahanka CCPP
(KPCL)

Karnataka

STATE

GT+ST

370

             

 

 

 

IV. Under Construction Nuclear Capacity

 

State

Location

Project

Capacity (MW)

Projects Under Construction

Gujarat

Kakrapar

KAPP- 4

1 X 700

Rajasthan

Rawatbhata

RAPP-7&8

2 X 700

Tamilnadu

Kudankulam

KKNPP-3&4

2 X 1000

KKNPP-5&6

2 X 1000

Kalpakkam

PFBR

500

 

(implemented by BHAVINI)

Haryana

Gorakhpur

GHAVP-1&2

2 X 700

Total

8000

 

 

V. Central Sector Additional Planned Thermal Capacity upto 2030

 

State

Utility Name

Project Name

Capacity Planned (MW)

 

 

 

 

Bihar

SJVN

Buxar (1×660)

660

 

 

Chhattisgarh

NTPC

Lara STPP-II (2×800)

1600

 

 

NTPC

Sipat-III (1×800)

800

 

 

Jharkhand

DVC

Koderma (2×800)

1600

 

 

Odisha

NTPC

Darlipali-II (1×800)

800

 

 

NLC

Talabira STPS (3×800)

2400

 

 

TamilNadu

NLC

Neyveli TPS-II 2nd Expansion (2×660)

1320

 

 

Uttar Pradesh

NTPC

Singrauli –III  (2×800)

1600

 

 

NTPC

Meja II (2×800)

2400

 

 

West Bengal

DVC

Raghunathpur (2×660)

1320

 

 

DVC

Durgapur (1×800)

800

 

 

Total

15300 MW

 

 

 

 

VI : State Sector Additional Planned Thermal Capacity upto 2030

 

Utility Name

Project Name

 

Capacity Planned

Chhattisgarh

Super Critical Power Plant at Korba West, Korba (2×660)

1320

MSPGCL, Maharashtra

Chandrapur  STPP

(1×660)

660

MPPCL, Madhya Pradesh

Amarkantak TPS (1×660)

660

Satpura TPP U-12, Phase –V (1×660)

660

Odisha

OPGC Expansion Project Stage III IB TPP (2×660)

1320

 

Rajasthan

(RRVUNL)

Kalisindh TPS

(1×800)

800

Telangana

Singareni TPS (Stage-II) (1×800)

800

MSPGCL, Maharashtra

Koradi  (2×660)

1320

 

Total

7540 MW

 