More than 2.95 lakh standalone off-grid solar water pumps installed under PM-KUSUM Scheme: Union Power and New & Renewable Energy Minister


azadi ka amrit mahotsav

The Union Minister for New & Renewable Energy and Power has informed abut the programme of PM-KUSUM Scheme.

The Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) Scheme was launched in March 2019 and scaled up last in September 2023 to provide affordable and accessible power to the farmers throughout the country. The main objectives of the PM KUSUM Scheme include to de-dieselize the farm sector, to provide energy and water security to farmers and enhance their income, and reduce environmental pollution.

The scheme has the following Components:

(i) Component ‘A’: Setting up of 10,000 MW of Decentralized Ground/ Stilt Mounted Grid Connected Solar or other Renewable Energy based Power Plants by the farmers on their land;

(ii) Component ‘B’: Installation of 14 lakh standalone off-grid solar water pumps; and

(iii) Component ‘C’: Solarization of 35 lakh existing grid-connected agriculture pumps and through feeder level solarization (FLS).

 

The details of the PM KUSUM scheme are given below.

Details of PM- KUSUM Scheme

Components, Targets & Criteria

Financial Assistance available

The Scheme is demand driven and open for all farmers of the country for implementation as per the scheme guidelines.

Component A: Setting up of 10,000 MW of Decentralized Ground/Stilt Mounted Solar Power Plants on barren/fallow/pasture/marshy/ cultivable land of farmers. Such plants can be installed by individual farmer, Solar Power Developer, Cooperatives, Panchayats and Farmers Producer Organisations.

Component B: Installation of 14 Lakh Stand-alone Solar Pumps in off-grid areas.

Component C: Solarisation of 35 Lakh Grid Connected Agriculture Pumps through (i) Individual Pump Solarisation and (ii) Feeder Level Solarisation.

 

The beneficiaries under Component-B and Component-C could be individual farmer, Water User Associations, Primary Agriculture Credit Societies and Communities/Cluster Based Irrigation Systems.

 

 

 

 

 

 

Procurement Based Incentive (PBI) to the DISCOMs @ 40 paise/kWh or Rs.6.60 lakhs/MW/year, whichever is lower, for buying solar/ other renewable power under this scheme. The PBI is given to the DISCOMs for a period of five years from the Commercial Operation Date of the plant. Therefore, the total PBI payable to DISCOMs is Rs. 33 Lakh per MW.

 

 

For Component-B and individual pump solarisation under Component-C:

CFA of 30% of the benchmark cost issued by MNRE or the prices of the systems discovered in the tender, whichever is lower is provided. However, in North Eastern States including Sikkim, Jammu & Kashmir, Ladakh, Himachal Pradesh and Uttarakhand, Lakshadweep and A&N Islands, CFA of 50% of the benchmark cost issued by MNRE or the prices of the systems discovered in the tender, whichever is lower, is provided.

In addition, the respective state/UT has to provide at least 30% financial support. Balance cost is to be contributed by beneficiary. Component B and Component C (IPS) of PM KUSUM scheme can also be implemented without State share of 30%. The Central Financial Assistance will continue to remain 30% and rest 70% will be borne by the farmer.

For agriculture feeder solarization, CFA of Rs 1.05 Crore per MW is provided. There is no mandatory requirement of financial support from participating State/UT. The feeder solarisation can be implemented in CAPEX or RESCO mode.

 

The Component wise progress made under PM-KUSUM is given below.

 

Progress under PM-KUSUM (as on 31.01.2024)

S. No.

State

Component-A (MW)

Component-B (Nos)

Component-C (Nos)

Sanctioned

Installed

Sanctioned

Installed

Sanctioned (IPS)

Sanctioned (FLS)

 Installed

1

Arunachal Pradesh

2

0

700

199

0

0

0

2

Assam

10

0

4000

0

1000

0

0

3

Chhattisgarh

30

1

10000

0

0

157500

0

4

Bihar

0

0

0

0

0

160000

0

5

Gujarat

500

0

8082

2459

0

625500

0

6

Goa

150

0

900

0

0

11000

700

7

Haryana

85

2.25

252655

80004

0

65079

0

8

Himachal Pradesh

100

22.9

1270

638

0

0

0

9

Jammu & Kashmir

20

0

5000

838

4000

0

0

10

Jharkhand

20

0

42985

12985

1000

0

0

11

Karnataka

0

0

27214

314

0

587000

0

12

Kerala

40

0

100

8

55100

25387

2824

13

Ladakh

0

0

1400

0

0

0

0

14

Madhya Pradesh

600

16.13

22400

7134

0

295000

0

15

Maharashtra

700

2

405000

79118

0

775000

1979

16

Manipur

0

0

150

78

0

0

0

17

Meghalaya

0

0

3035

54

0

0

0

18

Mizoram

0

0

2700

0

0

0

0

19

Nagaland

5

0

265

65

0

0

0

20

Odisha

500

0

8241

1411

65000

10000

0

21

Puducherry

0

0

0

0

0

0

0

22

Punjab

220

0

103000

12952

186

75000

0

23

Rajasthan

1200

121

248720

59732

6418

200000

1811

24

Tamil Nadu

424

0

5200

3187

0

0

0

25

Telangana

0

0

400

0

0

20000

0

26

Tripura

5

0

10895

2117

2600

0

50

27

Uttar Pradesh

155

0

114790

32212

2000

370000

0

28

Uttarakhand

0

0

5685

318

200

0

0

29

West Bengal

0

0

10000

0

23700

0

20

 

Total

4766

165.28

1294787

295823

161204

3376466

7384

                     

 

This information has been given by the Union Minister for New & Renewable Energy and Power Shri R. K. Singh, in a written reply to a question, in Lok Sabha today, February 8, 2024.

 

***

PIB DELHI | Alok Mishra / Dheep Joy Mampilly



Source PIB