- Production of Crude Oil
Crude oil production[1] during February,2021 was2322.32 TMT which is6.89% lower than target and3.22% lower when compared with February, 2020.Cumulative crude oil production during April-February, 2020-21 was 27878.81 TMT which is 5.65% and 5.41% lower than target for the period and production during corresponding period of last yearrespectively. Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of February, 2021 and cumulatively for the period April-February, 2020-21 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
Oil Company |
Target |
February (Month) |
April-February (Cumulative) |
||||||
2020-21 (Apr-Mar) |
2020-21 |
2019-20 |
% over last year |
2020-21 |
2019-20 |
% over last year |
|||
Target |
Prod.* |
Prod. |
Target |
Prod.* |
Prod. |
||||
ONGC |
20931.68 |
1579.89 |
1544.84 |
1672.97 |
92.34 |
19163.56 |
18469.67 |
18848.85 |
97.99 |
OIL |
3121.00 |
244.98 |
218.49 |
240.26 |
90.94 |
2848.51 |
2687.75 |
2852.55 |
94.22 |
PSC Fields |
8265.00 |
669.28 |
559.00 |
486.33 |
114.94 |
7536.85 |
6721.39 |
7770.91 |
86.49 |
Total |
32317.68 |
2494.14 |
2322.32 |
2399.55 |
96.78 |
29548.91 |
27878.81 |
29472.31 |
94.59 |
Note: Totals may not tally due to rounding off. *: Provisional
Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall are as under:
-
- Crude oil production by ONGC(Oil and Natural Gas Corporation) in nomination block during February, 2021 was 1544.84TMT which is 2.22%lower than target and7.66%lower when compared with February 2020. Cumulative crude oil production by ONGC during April-February, 2020-21 was 18469.67 TMT which is 3.62%and 2.01% lower than target for the period andproduction during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Production planned from WO-16 cluster could not be realized due to delay in MOPU (Sagar Samrat) as activities at GPC yard Abu Dhabi got affected due to COVID-19 restrictions / lockdown.
- Production planned from new wells in Ratna field affected due to non- availability of ESPs (Electrical submersible pump) due to implications of COVID-19. Presently rigs are deployed at two well platforms and wells are being completed with ESPs.
- New wells planned under Cluster-8 development project delayed due to delay in installation of new platforms due to COVID implications.
-
- Crude oil production by OIL(Oil India Ltd) in the nominationblock during February, 2021 was218.49 TMT which is 10.81% % lower than target and 9.06% lower when compared with February 2020. Cumulative crude oil production by OIL during April-February, 2020-21 was 2687.75 TMT which is 5.64% and 5.78% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than planned contribution from workover wells, drilling wells and old wells.
- Bandhs /blockade by local people and associations after the Baghjan Blowout.
-
- Crude oil production by Pvt/JVscompanies in the PSC (Production Sharing Contract) regime during February, 2021 was 559.00 TMT which ishigher 14.94% when compared to the February,2020 but 16.48% lower than the monthly target.Cumulative crude oil production by Pvt/JVs companies during April-February, 2021 was 6721.39 TMT which is 10.82% and 13.51% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- RJ-ON-90/1 (Cairn Energy India Ltd): Delayed start up full field polymer injection in Bhagyam and Aishwarya field. Delay in hook-up of Stage-2 wells and NA-1 processing facility commissioning in advance stage in ABH. Flow cease in few wells of Satellite fields. Project schedule of well and surface facility of Tukaram, Kaam-1 and GSV condensate is impacted by COVID-19.
- RAVVA (Cairn Energy India Ltd): Decline in production from producer wells
- B-80 (Hindustan Oil Exploration Company Ltd): Production from B80 field not commenced due to delay in completion of field development activities because of COVID
- PY-3 (HARDY): Production could not be commenced in PY-3 field.
- Production of Natural Gas
Natural gas production during February,2021 was 2307.12MMSCM which is 19.31% lower than the monthly target and 1.43% lower when compared with February, 2020. Cumulative natural gas production during April-February, 2020-21 was 25986.70MMSCM which is 14.54% and 9.67% lower than target for the period and production during corresponding period of last year respectively. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of February, 2021 and cumulatively for the period April-February, 2020-21 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (inMMSCM)
Oil Company |
Target |
February (Month) |
April-February (Cumulative) |
||||||
2020-21 (Apr-Mar) |
2020-21 |
2019-20 |
% over last year |
2020-21 |
2019-20 |
% over last year |
|||
Target |
Prod.* |
Prod. |
Target |
Prod.* |
Prod. |
||||
ONGC |
23982.98 |
1852.25 |
1630.20 |
1869.97 |
87.18 |
21932.99 |
20040.20 |
21840.67 |
91.76 |
OIL |
2761.73 |
238.14 |
187.88 |
200.79 |
93.57 |
2500.26 |
2269.64 |
2456.64 |
92.39 |
PSC Fields |
6826.82 |
768.79 |
489.04 |
269.76 |
181.29 |
5976.55 |
3676.86 |
4471.49 |
82.23 |
Total |
33571.53 |
2859.18 |
2307.12 |
2340.52 |
98.57 |
30409.81 |
25986.70 |
28768.80 |
90.33 |
Note: Totals may not tally due to rounding off. *: Provisional
Figure-2: Monthly Natural Gas Production
-
- Natural gas production by ONGC in the nominationblocks during February, 2021 was 1630.20MMSCM which is 11.99% lower than target and 12.82% lower when compared with February 2020. Cumulative natural gas production by ONGC duringApril-February, 2020-21 was 20040.20 MMSCM which is 8.63% and 8.24% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- Less Gas production from WO16 cluster due to delay in MOPU.
- Less than planned production from Vasistha / S1 wells in Eastern Offshore Assets (EOA) due certain reservoir related issues.
- Less gas intake by Uran Plant for maintenance jobs and less Offtake by consumers.
-
- Natural gas production by OILin the nomination block during February, 2021 was 187.88 MMSCM which is 21.11% lower than monthly target and 6.43% lower than the February, 2020. Cumulative natural gas production by OIL during April-February, 2020-21 was 2269.64 MMSCM which is 9.22% and 7.61% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Low upliftment/demand of gas by the major customers.
- Bandhs /blockade by local people and associations after the Baghjan Blowout.
-
- Natural gas production by Pvt/JVs companiesin the PSC (production sharing contracts) regime during February,2021 was 489.04MMSCM which is 81.29% higher than the February, 2020 but 36.39% lowerthan monthly target. Cumulative natural gas production by Pvt/JVs during April-February, 2020-21 was 3676.86MMSCM which is 38.48% and 17.77% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- RJ-ON/6 (Focus Energy Limited): Reduced Gas offtake by buyer.
- KG-DWN-98/2 (Oil & Natural Gas Corpn.): U3-B well is flowing less than the expected profile and delay in commissioning of Wells of U1-field.
- KG-OSN-2001/3 (Oil & Natural Gas Corpn.): Well D-7 is under completion and Testing.
- Raniganj East (Essar Oil and Gas Exploration & Production Ltd): Production is lower due to less sales off-take.
- RJ-ON/6 (Focus Energy Limited): Production is lower due to less sales off-take.
- Crude Oil Processed (Crude Throughput)
Crude Oil Processed during February, 2021 was 18617.41 TMT which is 7.60% lower than the target for the monthand 11.84% lower than February, 2020.Cumulative crude throughput during April-February, 2020-21 was200787.90 TMT which is 12.72% and 13.89% lower than target for the period and crude throughput during corresponding period of last year respectively. Refinery-wise details of the crude throughput and capacity utilization during the month of February, 2021 vis-à-vis February, 2020 are given at Annexure-III and Annexure-IV. Company-wise crude throughput for the month of February, 2021 and cumulatively for the period April-February, 2020-21vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.
Table 3: Crude Oil Processed (Crude Throughput) (in TMT)
Oil Company |
Target |
February (Month) |
April-February (Cumulative) |
||||||
2020-21 (Apr-Mar) |
2020-21 |
2019-20 |
% over last year |
2020-21 |
2019-20 |
% over last year |
|||
Target |
Prod.* |
Prod. |
Target |
Prod.* |
Prod. |
||||
CPSE |
147377.43 |
11566.49 |
11729.41 |
12168.69 |
96.39 |
134436.88 |
114662.11 |
132454.12 |
86.57 |
IOCL |
72400.04 |
5259.27 |
5387.06 |
5724.23 |
94.11 |
65846.41 |
56423.74 |
63683.24 |
88.60 |
BPCL |
33000.00 |
2549.00 |
2674.16 |
2659.50 |
100.55 |
30149.00 |
23462.58 |
28825.59 |
81.39 |
HPCL |
16999.28 |
1415.75 |
1378.92 |
1515.18 |
91.01 |
16057.23 |
14843.56 |
15665.44 |
94.75 |
CPCL |
10290.00 |
840.00 |
757.60 |
735.33 |
103.03 |
9370.00 |
7279.35 |
9307.45 |
78.21 |
NRL |
2549.86 |
197.15 |
227.10 |
224.69 |
101.07 |
2331.59 |
2466.45 |
2135.69 |
115.49 |
MRPL |
12074.42 |
1300.00 |
1297.36 |
1304.21 |
99.47 |
10624.42 |
10113.15 |
12756.43 |
79.28 |
ONGC |
63.83 |
5.32 |
7.21 |
5.55 |
129.97 |
58.23 |
73.27 |
80.29 |
91.25 |
JVs |
14772.00 |
1313.00 |
614.84 |
1680.43 |
36.59 |
13344.00 |
14634.45 |
18456.91 |
79.29 |
BORL |
7800.00 |
620.00 |
601.47 |
652.22 |
92.22 |
7140.00 |
5587.50 |
7179.70 |
77.82 |
HMEL |
6972.00 |
693.00 |
13.37 |
1028.21 |
1.30 |
6204.00 |
9046.95 |
11277.21 |
80.22 |
Private |
89515.16 |
7269.05 |
6273.16 |
7269.05 |
86.30 |
82271.22 |
71491.35 |
82271.22 |
86.90 |
RIL |
68894.99 |
5667.78 |
4876.36 |
5667.78 |
86.04 |
63370.05 |
56051.02 |
63370.05 |
88.45 |
NEL |
20620.18 |
1601.27 |
1396.79 |
1601.27 |
87.23 |
18901.17 |
15440.33 |
18901.17 |
81.69 |
TOTAL |
251664.61 |
20148.54 |
18617.41 |
21118.16 |
88.16 |
230052.09 |
200787.90 |
233182.24 |
86.11 |
Note: Totals may not tally due to rounding off. *: Provisional
Figure 3: Crude Oil Processed (Crude Throughput)
3.1 CPSE Refineries’ crude oil processed during February, 2021 was 11729.41TMT which is 1.41% higher than the target for the month but 3.61% lower when compared with February, 2020.Cumulative crude throughputby CPSE refineries during April-February, 2020-21 was 114662.11TMT which is 14.71% and 13.43% lower than target for the period and crude throughputduring corresponding period of last year respectively.Reasons for shortfall in production are as under:
- IOCL-Digboi: Crude processed lower due maintenance and installation shutdown.
- IOCL-Barauni: Crude processed lower due to lower product upliftment.
- IOCL-Bongaigaon: Crude processed lower due to as per crude availability.
- HPCL-Mumbai: Crude processed lower due to planned shutdown of secondary units.
- HPCL-Visakh: Crude processed lower due to unplanned shutdown of primary and secondary units.
3.2 JV refineries’ crude oil processed during February, 2021 was 614.84TMT which is 53.17% lower than the target for the month and 63.41% lower when compared with February, 2020. Cumulative crude throughput during April-February, 2020-21 was14634.45TMT which is 9.67% higher than target for the period but20.71% lower when compare with the corresponding period of last year respectively.Reasons for shortfall in production are as under:
- BORL-Bina: Crude processed lower due to lower demand of petroleum products amid ongoing COVID-19 pandemic.
- HMEL-Bhatinda: Crude processed lower dueto refinery planned shutdown during the month.
3.3 Private refineries’ crude oil processed during February, 2021 was 6273.16TMT which is 13.70% lower than the corresponding month of last year. Cumulative crude throughputduring April-February, 2020-21 was 71491.35 TMT which is 13.10% lower than thecorresponding period of last year.
- Production of Petroleum Products
Production of Petroleum Products during February, 2021 was 19439.03 TMT which is 5.86% lower than the target for the month and 10.92% lower when compared with February, 2020. Cumulative production during April-February, 2020-21 was 210683.03 TMT which is 10.83% and 12.23% lower than target for the period and production during corresponding period of last year respectively. Unit-wise production of petroleum products is given at Annexure-V. Company-wise production for the month of February, 2021 and cumulatively for the period April-February, 2020-21 vis-à-Vis same period of last year has been shown in Table-4 and month-wise in Figure-4.
Figure 4: Monthly Refinery Production of Petroleum Products
Table 4: Production of Petroleum Products (TMT)
Oil Company |
Target |
January (Month) |
April-January (Cumulative) |
||||||
2020-21 (Apr-Mar) |
2020-21 |
2019-20 |
% over last year |
2020-21 |
2019-20 |
% over last year |
|||
Target |
Prod.* |
Prod. |
Target |
Prod.* |
Prod. |
||||
CPSE |
138753.95 |
10926.31 |
11115.64 |
11691.12 |
95.08 |
126599.88 |
108596.68 |
125255.46 |
86.70 |
IOCL |
68760.50 |
5009.75 |
5134.48 |
5662.47 |
90.68 |
62520.65 |
54182.96 |
60940.73 |
88.91 |
BPCL |
31319.00 |
2433.00 |
2545.79 |
2543.13 |
100.10 |
28633.00 |
22381.77 |
27539.65 |
81.27 |
HPCL |
15914.53 |
1343.13 |
1316.68 |
1418.10 |
92.85 |
15045.41 |
13897.01 |
14568.11 |
95.39 |
CPCL |
9527.02 |
781.64 |
717.04 |
686.72 |
104.42 |
8671.74 |
6672.73 |
8534.03 |
78.19 |
NRL |
2554.46 |
199.72 |
222.32 |
217.37 |
102.28 |
2332.36 |
2489.99 |
2050.40 |
121.44 |
MRPL |
10618.44 |
1154.06 |
1172.80 |
1158.20 |
101.26 |
9341.99 |
8902.39 |
11548.59 |
77.09 |
ONGC |
60.00 |
5.01 |
6.53 |
5.14 |
127.06 |
54.73 |
69.82 |
73.95 |
94.42 |
JVs |
13590.40 |
1213.36 |
560.11 |
1534.63 |
36.50 |
12271.92 |
13562.22 |
17208.82 |
78.81 |
BORL |
6958.40 |
553.36 |
541.06 |
601.74 |
89.92 |
6369.92 |
4909.48 |
6560.55 |
74.83 |
HMEL |
6632.00 |
660.00 |
19.05 |
932.89 |
2.04 |
5902.00 |
8652.75 |
10648.27 |
81.26 |
Private |
102154.50 |
8211.58 |
7459.64 |
8211.58 |
90.84 |
93205.01 |
84669.54 |
93205.01 |
90.84 |
RIL |
82374.12 |
6677.60 |
6100.06 |
6677.60 |
91.35 |
75071.58 |
69702.65 |
75071.58 |
92.85 |
NEL |
19780.38 |
1533.98 |
1359.58 |
1533.98 |
88.63 |
18133.42 |
14966.89 |
18133.42 |
82.54 |
Total Refinery |
254498.86 |
20351.24 |
19135.38 |
21437.32 |
89.26 |
232076.81 |
206828.44 |
235669.28 |
87.76 |
Fractionators |
4523.28 |
298.37 |
303.64 |
384.15 |
79.04 |
4193.95 |
3854.59 |
4369.95 |
88.21 |
TOTAL |
259022.13 |
20649.61 |
19439.03 |
21821.48 |
89.08 |
236270.76 |
210683.03 |
240039.24 |
87.77 |
Note: Totals may not tally due to rounding off. *: Provisional
-
- Production of petroleum Products by Oil’s Refineries during February, 2021 was 19135.38 TMT which is 5.97% lower than the target for the month and 10.74% lower when compared with February, 2020. Cumulative production of petroleum products by refineries during April-February, 2020-21 was 206828.44 TMT which is 10.88% and 12.24% lower than target for the period and production during corresponding period of last year respectively.
-
- Production of petroleum Products by Fractionators during February, 2021 was 303.64 TMT which is 1.77% higher than the target for the month but 20.96% lower when compared with February, 2020. Cumulative production by Fractionators during April-February, 2020-21 was 3854.59 TMT which is 8.09% and 11.79% lower than target for the period and production during corresponding period of last year respectively.
Click here to see Annexure III
********
YB/SK