The Union Cabinet, chaired by the Prime Minister Narendra Modi has approved the development of Pune Metro Rail Project Phase – 1.
The Pune Metro Rail Corridor will be covering a length of 31.254 km comprising with two corridors i.e. Corridor-1 {Pimpri Chinchwad Municipal Corporation (PCMC) to Swargate} covering length of 16.589 km (11.57 km elevated and 5.019 km underground) and Corriodor-2 (Vanaz to Ramwadi) covering 14.665 km (fully elevated).
The total completion cost of the metro rail corridor will be Rs.11,420 crore. The population of approximately 50 lakh of Pune Metropolitan Area will be benefitted through this metro corridor.
The Project will be implemented by Maharashtra Metro Rail Corporation Limited (MAHA-METRO), which will be a 50:50 jointly owned company of Government of India and Government of Maharashtra.
Background:
Pune Metropolitan Area includes Pune Municipal Corporation (PMC), Pimpri Chinchwad Municipal Corporation (PCMC). Both the cantonment areas namely Pune and Khadki have witnessed rapid growth of population.
The population of Pune Urban Agglomeration was 4.99 million as per 2011 census compared to 3.57 million in 2001 census. This is further projected to increase to 6.90 million in 2021 and 7.73 million in 2031.