The National Perspective Plan (NPP) was prepared by the then Ministry of Irrigation (now Ministry of Jal Shakti) in August 1980 for water resources development through inter basin transfer of water, for transferring water from water surplus basins to water-deficit basins. Under the NPP, the National Water Development Agency (NWDA) has identified 30 links (16 under Peninsular Component & 14 under Himalayan Component) for preparation of Feasibility Reports (FRs). The details of above river linking projects viz., rivers, States concerned is given at Annexure.
Under the Peninsular Component of NPP, the following 14 links are envisaged in the Southern part of India:
- Mahanadi (Manibhadra) -Godavari (Dowlaiswaram) link
- Godavari (Inchampalli) – Krishna (Pulichintala) link
- Godavari (Inchampalli) – Krishna (Nagarjunasagar) link
- Godavari (Polavaram) – Krishna (Vijayawada) link
- Krishna (Almatti) – Pennar link
- Krishna (Srisailam) – Pennar link
- Krishna (Nagarjunasagar) – Pennar (Somasila ) link
- Pennar (Somasila) – Cauvery (Grand Anicut) link
- Cauvery (Kattalai) – Vaigai -Gundar link
- Par-Tapi-Narmada link
- Damanganga – Pinjal link
- Bedti – Varda link
- Netravati – Hemavati link
- Pamba – Achankovil – Vaippar link
Out of the above 14 links, the following 8 link projects involve Narmada, Godavari and Krishna rivers.
- Mahanadi (Manibhadra) – Godavari (Dowlaiswaram) link
- Godavari (Polavaram)–Krishna (Vijayawada) (Implemented by Govt. of AP)
- Godavari (Inchampalli) –Krishna (Pulichintala) link
- Godavari (Inchampalli)– Krishna (Nagarjunasagar) link
- Krishna (Nagarjunasagar)–Pennar (Somasila) link
- Krishna (Srisailam) – Pennar link
- Krishna (Almatti) – Pennar link
- Par-Tapi –Narmada link project
The Pre-Feasibility Reports (PFRs) and FRs of the links under SI no. 1 to 8 above including the Detailed Project Report (DPR) of Par-Tapi-Narmada link project were already completed and circulated to party States. Pending consensus on Manibhadra and Inchampalli dams due to large submergence, alternate study to divert unutilized waters of Indravati sub-basin of Godavari basin have been carried out and the DPR viz. Godavari (Inchampalli barrage)-Cauvery (Grand Anicut) link project has also been completed and circulated to party States. The details of rivers to be linked are already included in Annexure. The Special committee for Interlinking of Rivers (ILR), after considering the views of all the stakeholders, is proceeding ahead to expedite the objectives of the interlinking of rivers in a consultative and cooperative manner. The implementation of the ILR projects involves various steps such as perpetration of PFRs/FRs of links, negotiation and consensus among concerned States, preparation of DPRs of the projects, clearance from appraisal agencies which includes clearance by Ministry of Environment & Forests and Climate Change and Ministry of Tribal Affairs, techno-economic clearance by Advisory Committee on Irrigation, Flood control &Multipurpose Projects of Ministry of Jal Shakti, investment clearance and the construction time required for the completion of the projects as per the DPR.
Thus, the implementation of the projects will take varying periods of time. An ILR project would reach the implementation stage when all the statutory clearances are taken and an agreement is reached amongst party states from the implementation of the project.
This Information was given by the Minister of State for Jal Shakti & Tribal Affairs, ShriBishweswarTudu inRajyaSabha today.
AnnexurE
Annexure referred to in reply to part (a) & (b) of Unstarred Question No. 73 to be answered in Rajya Sabha on 19.07.2021 regarding “SPECIAL SCHEME FOR INTER-LINKING OF RIVERS”.
Names of Inter Basin Water Transfer Links, the States involved, name of rivers and status of Feasibility Reports/Detailed Project Report
S. No |
Name |
Rivers |
States concerned |
Present Status |
Peninsular Component |
|
|
|
|
1 |
Mahanadi (Manibhadra) -Godavari (Dowlaiswaram) link |
Mahanadi & Godavari |
Odisha, Maharashtra, AP, MP, Telangana, Jharkhand, Karnataka, Chhattisgarh |
FR Completed* |
2 |
Godavari (Inchampalli) – Krishna (Pulichintala) link |
Godavari & Krishna |
Odisha, Maharashtra, AP, MP, Telangana, Karnataka, Chhattisgarh |
FR Completed |
3 |
Godavari (Inchampalli) – Krishna (Nagarjunasagar) link |
Godavari & Krishna |
-do- |
FR Completed # DPR Completed |
4 |
Godavari (Polavaram) – Krishna (Vijayawada) link |
Godavari & Krishna |
-do- |
FR Completed |
5 |
Krishna (Almatti) – Pennar link |
Krishna &Pennar |
Maharashtra, Andhra Pradesh, Karnataka &Telangana |
FR Completed |
6 |
Krishna (Srisailam) – Pennar link |
Krishna &Pennar |
-do- |
FR Completed |
7 |
Krishna (Nagarjunasagar) – Pennar (Somasila ) link |
Krishna &Pennar |
-do- |
FR Completed # DPR Completed |
8 |
Pennar (Somasila) – Cauvery (Grand Anicut) link |
Pennar& Cauvery |
Andhra Pradesh, Karnataka, Tamil Nadu, Kerala & Puducherry |
FR Completed # DPR Completed |
9 |
Cauvery (Kattalai) – Vaigai -Gundar link |
Cauvery,Vaigai&Gundar |
Karnataka, Tamil Nadu, Kerala & Puducherry |
DPR Completed |
10 |
Ken-Betwa link |
Ken &Betwa |
Uttar Pradesh & Madhya Pradesh |
DPR (Phase-I,II & Comprehensive report) Completed |
11 (i) |
Parbati -Kalisindh- Chambal link |
Parbati, Kalisindh& Chambal |
Madhya Pradesh, Rajasthan & Uttar Pradesh (UP requested to be consulted during consensus building) |
FR Completed |
(ii) |
Parbati-Kuno-Sindh link |
Parbati, Kuno and Sindh |
MP and Rajasthan |
PFR completed$ |
12 |
Par-Tapi-Narmada link |
Par, Tapi& Narmada |
Maharashtra & Gujarat |
DPR Completed |
13 |
Damanganga – Pinjal link |
Damanganga&Pinjal |
Maharashtra & Gujarat |
DPR Completed |
14 |
Bedti – Varda link |
Bedti&Varda |
Maharashtra, Andhra Pradesh & Karnataka |
PFR Completed |
15 |
Netravati – Hemavati link |
Netravati& Hemavati |
Karnataka, Tamil Nadu & Kerala |
PFR Completed |
16 |
Pamba – Achankovil – Vaippar link |
Pamba, Achankovil& Vaippar |
Kerala & Tamil Nadu, |
FR Completed |
* FR of alternate Mahanadi (Barmul) – Rushikulya – Godavari (Dowlaiswaram) link project completed # Pending consensus on Manibhadra and Inchampalli dams, alternate study to divert unutilised waters of Godavari river carried out and DPR of Godavari (Inchampalli) – Pennar (Somasila)- Cauvery (Grand Anicut) link project completed. $ Integration of Eastern Rajasthan Canal Project of Rajasthan and Parbati- Kalisindh-Chambal link. |
||||
Himalayan Component |
||||
1. |
Manas-Sankosh-Tista-Ganga (M-S-T-G) link |
Manas, Sankosh, Tista and Ganga |
Assam, West Bengal, Bihar& Bhutan |
FR completed |
2. |
Kosi-Ghaghra link |
Kosi&Ghaghra |
Bihar , Uttar Pradesh & Nepal |
PFR completed |
3. |
Gandak-Ganga link |
Gandak& Ganga |
-do- |
FR completed (Indian portion) |
4. |
Ghaghra-Yamuna link |
Ghaghra& Yamuna |
-do- |
FR completed (Indian portion) |
5. |
Sarda-Yamuna link |
Sarda& Yamuna |
Bihar, Uttar Pradesh, Haryana, Rajasthan, Uttarakhand& Nepal |
FR completed (Indian portion) |
6. |
Yamuna-Rajasthan link |
Yamuna &Sukri |
Uttar Pradesh, Gujarat, Haryana & Rajasthan |
Draft FR completed |
7. |
Rajasthan-Sabarmati link |
Sabarmati |
-do- |
FR completed |
8. |
Chunar-Sone Barrage link |
Ganga &Sone |
Bihar & Uttar Pradesh |
Draft FR completed |
9. |
Sone Dam – Southern Tributaries of Ganga link |
Sone&Badua |
Bihar & Jharkhand |
PFR completed |
10. |
Ganga(Farakka)-Damodar-Subernarekha link |
Ganga, Damodar&Subernarekha |
West Bengal, Odisha& Jharkhand |
FR completed |
11. |
Subernarekha-Mahanadi link |
Subernarekha& Mahanadi |
West Bengal &Odisha |
FR completed |
12. |
Kosi-Mechi link |
Kosi&Mechi |
Bihar , West Bengal & Nepal |
PFR completed |
13. |
Ganga (Farakka)-Sunderbans link |
Ganga &Ichhamati |
West Bengal |
FR completed |
14. |
Jogighopa-Tista-Farakka link (Alternative to M-S-T-G) |
Manas, Tista& Ganga |
-do- |
Dropped |
*****
AS/SK